To main content

Sports hall Hamm

Semi-permanent Sports Hall in Hamm, Germany

With sports playing an important role in communities, the city of Hamm (Germany) commissioned Losberger De Boer to construct a semi-permanent sports hall while a new public sports hall is being built.

  • Client

    Semi-permanent Sports Hall in Hamm, Germany

A new sports hall to bridge the gap

The old sports hall has deteriorated over the years and the city administration decided to build a new hall, that is compliant with all the latest health and safety regulations. As the building process will take several years, the city opted to transfer all sporting activities to a semi-permanent sports hall from Losberger De Boer.

Our quick-to-build high-quality aluminum hall offers Hamm the perfect transitional solution. It will be rented for a 3 to 5 year period.

Full turnkey solution

The entire facility was delivered turnkey, including a special sports floor, deflector walls, insulated roof, and wall elements.

Let’s get technical
For the structure, we used a 15m wide and 30m long Alu Hall, with additional Losberger De Boer Container modules. We delivered the following components:

  • Special sports floor
  • Deflector walls
  • Insulated roof and wall elements
  • Changing rooms
  • Sanitary facilities
  • Technical equipment room
  • Heating and air-conditioning system
  • Lighting
  • Fire alarm system

Interested in this Commercial space solution?

Feel free to reach out to us for more information on owning or renting one of our structures.

Paul Machin
Paul Machin

Sales Director