To main content

Temporary school facilities delivered rapidly to support education continuity

Interested in this solution?

Feel free to reach out to us for more information on renting or owning one of our structures.

  • Client

    Department for Education

Interested in this solution?

Feel free to reach out to us for more information on renting or owning one of our structures.

Rapid delivery of temporary classrooms to support continuity and growth in education

When educational facilities become unavailable or capacity requirements change, the impact on students and staff is immediate. Continuity of learning and daily structure can quickly come under pressure.

This project was delivered in the United Kingdom, where structural safety concerns required urgent action across multiple schools. In this context, a temporary solution was needed quickly — not only to provide space, but to ensure a safe and stable learning environment.

Working in close coordination with public authorities, a rapid solution was implemented to restore teaching capacity without delay.

Project facts
  • 22 fully equipped classrooms
  • Delivered on schedule
  • Installed on existing school groundsLDB UK Case Honywood School RAAC Crisis

Our role 

Appointed by public authorities, Losberger De Boer delivered two fully equipped temporary school buildings on-site.

The solution included 22 classrooms, ICT spaces, staff rooms and essential facilities, designed to support daily school operations.

A 20 x 55 metre Delta structure, combined with a 5 x 25 metre canopy, created sufficient space for teaching, circulation and sheltered access between buildings.

The facilities were installed efficiently, providing immediate capacity while long-term development plans were underway. The solution can be scaled, adapted or relocated depending on evolving requirements.

The results

The temporary school buildings were completed on schedule, enabling students to return to a fully operational learning environment shortly after the initial disruption.

The facilities restored structure, supported uninterrupted education, and ensured a stable environment for both students and staff.

The buildings quickly became an integrated part of the school’s operations.

Impact for students and staff

Students continued their education in a safe, high-quality and comfortable environment.

Teachers were able to deliver lessons effectively, supported by well-equipped facilities.

For the wider community, the solution ensured continuity and reinforced confidence in the reliability of educational infrastructure.

Supporting education with flexible, scalable solutions

Across growing regions, education infrastructure must adapt quickly to changing needs.

Temporary modular facilities provide a flexible and reliable solution for both urgent requirements and planned expansion.

By delivering high-quality spaces at speed, education continuity is maintained while future development remains possible.

 

Client testimonial:

“The project provided a clear introduction to the Losberger product, with a quick response to the school’s needs and a collaborative approach to layout, design and delivery. It was completed to plan and on time, supported throughout by strong communication from the Project Manager and wider team”. 

- Peter McLean, Head of Estates, Saffron Academy Trust 

 

Read more about our Education Facilities HERE.

Interested in this Commercial space solution?

Feel free to reach out to us for more information on owning or renting one of our structures.

Paul Machin
Paul Machin

Sales Director