RAAC and building safety: How to keep operations running when buildings become unsafe
When a building can no longer be used safely, the consequences extend far beyond its walls. Schools need to keep teaching, hospitals need to continue providing care, and businesses need to maintain their operations. For the people who depend on these facilities every day, continuity matters.
The discovery of Reinforced Autoclaved Aerated Concrete (RAAC) in existing buildings has highlighted how structural safety concerns can quickly become operational challenges. While inspections, repairs, and redevelopment may take considerable time, the activities taking place inside these buildings cannot always wait.
So, what is RAAC, what risks does it present, and how can organizations maintain continuity while addressing structural safety concerns?
What is RAAC?
Reinforced Autoclaved Aerated Concrete (RAAC) is a lightweight construction material that was widely used in the United Kingdom and other countries during the second half of the twentieth century.
Its relatively low cost, insulating properties, and ease of installation made it an attractive alternative to conventional concrete, particularly for roof panels.
However, concerns about its long-term structural performance have increased as buildings containing RAAC have aged. Its porous composition makes it susceptible to moisture penetration and corrosion of the internal reinforcement, potentially compromising its structural integrity.
In some circumstances, RAAC panels can fail with little visible warning. Identifying and assessing the material requires qualified structural engineering expertise.
Which buildings can be affected by RAAC?
Although school closures in the United Kingdom brought RAAC to international attention, the material was used across a much wider range of buildings, including:
-
Schools and educational facilities
-
Hospitals and healthcare facilities
-
Airports and transport infrastructure
-
Commercial buildings
-
Theaters and cultural venues
-
Public and community buildings
-
Residential buildings
The presence of RAAC does not automatically mean that a building is unsafe. Its condition, structural application, and associated risks must be assessed by qualified professionals.
For building owners and facility managers, the challenge is not only determining how to address the structural issue but also preparing for the operational consequences if parts of a building need to close.
Maintaining continuity when buildings become unavailable
Structural investigations, remediation, and permanent reconstruction can take months or even years. During this period, organizations still need space to carry out their essential activities.
Relocating to another site is not always practical. Suitable buildings may be unavailable, relocation can introduce additional costs, and moving people away from familiar surroundings can create further disruption.
Temporary and semi-permanent space solutions offer an alternative by allowing organizations to establish additional facilities, potentially within their existing site.
Depending on the requirements, these spaces can accommodate classrooms, dining facilities, administrative offices, healthcare environments, or other essential operations.
The objective is not simply to replace lost floor space. It is to preserve the services, routines, and activities that people rely on.
How temporary and semi-permanent buildings support operational continuity
When existing facilities become unavailable, temporary and semi-permanent buildings can provide a practical solution while longer-term decisions are being made.
Speed
Compared with conventional construction, modular and demountable buildings can often be delivered within significantly shorter timeframes, depending on the project scope, site conditions, and regulatory requirements.
Flexibility
Layouts can be adapted to the specific activities taking place inside, from teaching and dining to working and providing essential services.
Continuity
Where site conditions allow, additional facilities can be installed close to existing buildings, helping organizations maintain familiar routines and minimize disruption.
Financial flexibility
Temporary and semi-permanent solutions can help organizations avoid committing to permanent construction before their long-term requirements are fully understood.
Reusability
Demountable structures can be dismantled, relocated, and reused where appropriate, supporting a more resource-efficient approach to temporary accommodation.
Long-term usability
When remediation or redevelopment takes longer than expected, semi-permanent buildings can provide a functional environment for extended periods.
From immediate space requirements to functional environments
Every organization faces different challenges when an existing building becomes unavailable. The right solution depends on the activities that need to continue, the available space, the anticipated duration of use, and the requirements of the people using the facility.
Losberger De Boer works with organizations to translate these requirements into practical space solutions, from initial consultation and site assessment through design, engineering, installation, and handover.
Facilities can be configured as independent buildings or integrated with existing infrastructure, depending on the site and project requirements.
With in-house design, manufacturing, and engineering expertise, we develop solutions around the intended use of each building, taking applicable local regulations and project-specific requirements into account.
Operational continuity in practice
The following projects demonstrate how temporary and semi-permanent space solutions can help educational institutions maintain essential activities when their existing facilities become unavailable.
The Gilberd School, United Kingdom: Keeping school meals available during the RAAC crisis

Just days before the start of a new school term, The Gilberd School was informed that parts of its building could no longer be used due to RAAC concerns. Among the affected facilities were its kitchen and dining areas, leaving the school facing the challenge of providing meals for 1,600 students.
Losberger De Boer delivered a temporary kitchen and dining facility in less than two weeks. Working closely with the school and its kitchen staff, the layout was adapted to support their daily operations.
The additional space enabled the school to continue providing an essential service without waiting for a permanent solution.
“They’ve adapted to us, enhanced it in our school colours, been talking to us at all times, worked with our kitchen staff to ensure that the layout works for them, it has been really easy, incredibly professional and a pleasure really.”
— Nicola Elliott, Director of Finance and Operations
Lytchett Minster School, United Kingdom: Returning students to education after a fire

RAAC is only one example of how existing buildings can suddenly become unavailable. Fire damage and other unexpected events can create similar challenges.
Following a devastating fire at Lytchett Minster School, students needed a functional learning environment that could accommodate the school's specific educational requirements, including its specialization in performing arts.
Working alongside the school, its insurance company, and loss adjusters, Losberger De Boer delivered 3,300 m² of temporary school facilities in just six weeks.
The new facilities enabled students to return to their timetable with minimal disruption to their education.
“I have been tremendously impressed by Losberger De Boer. They have been outstanding – not only in terms of the quality of their systems but also in how quickly they understood our project, both from a technical and educational perspective.”
— Stuart Clark, Headmaster at Lytchett Minster School
Preparing for the unexpected
Whether caused by RAAC, structural deterioration, fire damage, or planned renovation, the loss of usable space can have significant consequences for an organization and the people who depend on it.
Considering alternative space solutions early can help organizations prepare for potential closures, reduce operational disruption, and make informed decisions about their long-term facilities.
While the permanent building is being assessed, repaired, or replaced, education, healthcare, business, and community services can continue.