1000 m² of scalable warehousing space in six days

When Werner Mitsch GmbH needed additional storage space, she turned to Losberger De Boer to deliver a fully functional warehouse with 1000 m2 of storage area.

The family business Werner Mitsch GmbH, founded in 1971, established itself in the metal sheet forming business through comprehensive knowledge. Customers of the Swabian company value the high economic value of the produced goods. That includes samples, individual and serial manufacturing or even the development of entire components and complete solutions. Until now, the company has had around 5.000m² (~55.000ft²) of production and warehousing space.

Precision and economic reliability is a highly valued factor in the metal sheet forming business and partners and suppliers are held to the same high standards. As Losberger De Boer is a certified ISO 9001-2015 and ISO 14001-2015 company, the specialist in modular space solutions has already worked with Werner Mitsch in the past.

In 2019, Mitsch sought to enlarge its warehousing space. To accommodate its long-standing partner, Losberger De Boer set up an industrial hall with 1.000m² (~11.000ft²) of storage area. The new building was equipped with two sectional roller shutters and glass panels on all sides. Thus, on all sides, meaning workers benefit from a maximum amount of daylight. Furthermore, three smoke exhausts were placed in the depot for fire protection reasons. Trapezoidal plates on the walls and within the roof provide additional stability.

A fast and reliable solution to production peaks

Whenever a quick reaction to market developments is required, detachable industrial halls by Losberger De Boer can be used to increase productivity almost overnight. In the end, flexibility plays a big role in economic success. After a short assembly time and with all possible options for rapidly scaling up and down made available, Werner Mitsch GmbH has had its new warehouse handed over after a construction period of only six days.